[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"product-detail:qms-1":3},{"code":4,"msg":5,"data":6},2000,"success",{"slug":7,"name":8,"summary":9,"architecture":10,"capabilities":47,"features":66,"advantages":74,"problems":87,"scenarios":104,"delivery":117},"qms-1","企业产品生命周期管理系统（PLM）","面向制造企业管产品从需求、设计、样品验证到量产发布和退市的全流程，用版本基线和变更单把各阶段串起来。",{"layers":11},[12,19,26,33,40],{"label":13,"nodes":14},"数据源与接入",[15,16,17,18],"产品需求与立项单","CAD 图纸与设计文档","BOM 与物料主数据","试制与测试记录",{"label":20,"nodes":21},"采集与治理",[22,23,24,25],"产品编码与版本基线","工程变更单与审批","文档归档与权限","测试用例模板库",{"label":27,"nodes":28},"核心能力层",[29,30,31,32],"需求到设计台账","样品验证与放行","量产发布与灰度","退市评估与替换",{"label":34,"nodes":35},"平台服务层",[36,37,38,39],"流程引擎与变更审批","ERP 物料与 BOM 同步","进销存与订单协同","研发与经营统计",{"label":41,"nodes":42},"交付与价值",[43,44,45,46],"全生命周期产品台账","历史版本与基线存档","退市决策记录","在役替换与归档清单",[48,51,54,57,60,63],{"title":49,"desc":50},"需求立项","把市场与客户需求整理成产品需求单，关联立项评审与目标，形成后续设计和验证都能追溯的起点。",{"title":52,"desc":53},"设计版本管理","按版本管理图纸、BOM 和工艺文件，变更走审批并保留历史基线，任何一版都能还原出当时的物料清单。",{"title":55,"desc":56},"样品验证","用检查项与用例模板执行试制验证，比对实测值和设计指标，差异标注后进整改清单再决定放行。",{"title":58,"desc":59},"量产发布","验证通过后按发布流程放行量产，支持灰度与回滚，变更过程可追到具体版本和审批单。",{"title":61,"desc":62},"退市管理","做退市评估、定在役替换方案并把产品数据归档，过程保留决策记录与替换对应关系。",{"title":64,"desc":65},"进销存协同","打通销售订单、采购入库与库存核算，按批次成本结转往来账目，让研发台账和经营账对得上。",[67,68,69,70,71,72,73],"产品需求、立项到退市的全生命周期台账","图纸、BOM 与工艺文件按版本基线管理","工程变更走审批，旧版基线完整保留","测试用例模板库，批量执行与结果差异标注","量产放行支持灰度发布与一键回滚","退市评估、数据归档与在役替换方案","移动端审批，异地会签与附件在线预览",[75,78,81,84],{"title":76,"desc":77},"一版 BOM 说得清","图纸、物料清单和工艺按版本基线绑在一起，问某批量产用的是哪一版，直接调得出，不靠翻邮件。",{"title":79,"desc":80},"变更留得下痕迹","工程变更单从申请、审批到生效全程记录，旧版不覆盖，出问题能定位到是哪次改版引入的。",{"title":82,"desc":83},"验证不放水","试制结果按用例模板逐项比对设计指标，差异挂整改清单，没关完的单据走不到量产放行。",{"title":85,"desc":86},"退市不丢数据","产品下市时把决策记录、替换关系和历史版本一起归档，在役设备后续维护还查得到原始资料。",[88,92,96,100],{"title":89,"desc":90,"gain":91},"图纸版本靠文件名分辨","设计文件在共享盘里改来改去，生产领用的到底是不是最新版，谁都不敢打包票。","按版本基线归档，生产只认已放行的那一版，旧版只读留存，领错版的情况被挡住。",{"title":93,"desc":94,"gain":95},"改了 BOM 没人通知生产","工程变更在研发内部走完，采购和车间还在按旧清单备料，装到一半才发现对不上。","变更单审批生效后同步物料与 BOM 主数据，采购和车间按新版备料，停线待料减少。",{"title":97,"desc":98,"gain":99},"验证结论散在报告里","试制数据、测试报告和整改邮件各存一处，量产评审时临时拼材料，漏项靠人记。","用例模板逐项留结果，差异进整改清单，评审直接看未关闭项，放行依据一次出齐。",{"title":101,"desc":102,"gain":103},"产品退市后资料找不到","老型号停产几年后要维修，当时的图纸、替换件和决策过程没人说得清。","退市时归档决策记录与替换对应关系，按产品编码就能查到历史基线和维护资料。",[105,108,111,114],{"title":106,"desc":107},"新产品立项到量产","从需求单立项，做设计版本与 BOM，跑样品验证，关完整改后按发布流程放行量产。",{"title":109,"desc":110},"工程变更落地","提出变更单，走审批并生成新版本基线，同步物料与工艺文件，旧版留档供追溯。",{"title":112,"desc":113},"试制验证评审","按用例模板批量执行测试，比对设计指标并标注差异，输出未关闭项清单供评审放行。",{"title":115,"desc":116},"老产品退市归档","做退市评估与在役替换方案，归档历史版本和决策记录，保留后续维护可查的资料。",{"intro":118,"deploy":119,"integrations":120,"data":124,"audit":125,"pricing":126},"按源码包交付，先建产品编码与物料主数据，再配需求、设计、验证、发布、退市各阶段的台账和变更审批流，最后接 ERP 物料与 BOM，附初始化账套与报表模板。","支持集团多组织集群、单体企业一体化与财务独立双机热备三种部署。技术栈采用 Spring Boot 3.2、Vue 3 + Vite、PostgreSQL 15、Redis 7 与 Flowable 流程引擎，适配麒麟 V10、统信 UOS、CentOS 7+ 与 Windows Server。",[121,122,123],"CAD 图纸与设计文档库","ERP 物料与 BOM 主数据","销售订单与进销存单据","以产品编码为主线，需求单、设计版本、BOM、验证报告、变更单、放行单和退市记录串成一条台账；每次改版生成新基线，物料与 BOM 同步到 ERP，订单与库存核算按批次成本回流经营账。","工程变更与量产放行走审批流，记录申请、审批人与生效版本；版本基线只读留存不可覆盖；退市决策记录与替换关系随台账归档，可导出作为追溯底稿。","按源码包授权加实施服务计费，产品编码体系、历史资料迁移与变更流配置决定实施工作量，交付后由企业研发与工艺团队自主运维。"]